2010-01-03


2010-01-03 Marked and drilled holes for the seat belt cable wear block washers.



2010-01-03 Cut them apart



2010-01-03 Blockes drilled



2010-01-03 Back side look



2010-01-03 Me debburing



2010-01-03 Tunnel Cover drilled and fitted.



2010-01-03



2010-01-03



2010-01-03 Tunnel cover with the Flap support in.


Previous | Home | Next

Questions, Comments, Concerns Please E-Mail Me